Controller for automatic transmission

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10267414
APP PUB NO 20180023696A1
SERIAL NO

15651360

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a controller for an automatic transmission, when a jump gear shift via a plurality of intermediate shift stages is executed, a first and a second target intermediate shift stages are extracted, and a target input shaft rotation speed change rate is calculated from a difference in synchronous rotation speed between a shift stage before a current gear shift and the second target intermediate shift stage as a target shift stage of a gear shift which is executed after the current gear shift. Accordingly, it is possible to avoid a situation in which a shifting time in the gear shift control of the step before the second target intermediate shift stage becomes very short and thus packing of a clutch pack is not executed in a timely manner.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ota, Keisuke Toyota, JP 91 695
Sagawa, Ayumu Toyota, JP 31 100
Tsukamoto, Norihiro Toyota, JP 24 57

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 23, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 23, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00