Sealing array for a transmission, in particular for the output shaft of a transmission, and transmission having the sealing array

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10634232
APP PUB NO 20180023682A1
SERIAL NO

15546233

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a sealing array for a transmission, in particular for the output shaft of a transmission, and a transmission having a sealing array, a spacer ring is situated between a first and a second shaft-sealing ring, a flange part is connected to the coupling flange, in particular by screws, and a coupling flange presses the second shaft-sealing ring against the spacer ring, the spacer ring presses on the first shaft-sealing ring so that the first shaft-sealing ring is positioned against a flange part. The flange part, the coupling flange, the first shaft-sealing ring, the spacer ring, and the second shaft-sealing ring are arranged as a pre-assembled unit, and thus, in particular, as a transportable, integrated unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEW-EURODRIVE GMBH & CO KGBRUCH SAAR GERMANY BRUCHSAL BADEN-WURTTEMBERG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barton, Peter Bretten, DE 15 36
Reineberg, Martin Durmersheim, DE 2 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00