Fuel control systems and methods for delay compensation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9995236
SERIAL NO

15218226

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A delay module, based on a base request received for a first loop, sets a delayed base request for a second loop. A first period between the first and second loops corresponds to: a first delay period of an oxygen sensor; and a second delay period for exhaust to flow from a cylinder of an engine to the oxygen sensor. A closed loop module determines a closed loop correction for the second loop based on: the delayed base request for the second loop; a measurement from the oxygen sensor; the closed loop correction for the first loop; and the closed loop correction for a third loop. A second period between the second and third loops corresponds to the first delay period of the oxygen sensor. A summer module sets a final request for the second loop based on the base request plus the closed loop correction for the second loop.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLCP O BOX 300 MAIL CODE 482-C23-B21 DETROIT MI 48265-3000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shibata, Jonathan T Whitmore Lake, US 34 226

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00