Turbine wastegate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10233827
APP PUB NO 20180023462A1
SERIAL NO

15218045

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A turbine housing assembly can include a turbine housing that includes an exterior surface, an interior surface that includes a wastegate seat, and a bore that extends between the interior surface and the exterior surface; a bushing disposed at least partially in the bore where the bushing includes a bushing bore; a wastegate that includes a shaft that extends through the bushing bore to a shaft end, a shaft shoulder disposed in the bushing bore, a plug, and an arm disposed between the shaft and the plug; a ring disposed at least in part in the bushing bore between the shaft shoulder and the shaft end; and a control arm connected to the shaft proximate to the shaft end to define an axial distance between a surface of the control arm and the shaft shoulder where the ring has an axial length that is less than the axial distance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JPMORGAN CHASE BANK N A AS ADMINISTRATIVE AGENT383 MADISON AVE 5TH FLOOR NEW YORK NY 10179

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cizek, Petr Brno, CZ 7 34
Forbelsky, Antonin Brno, CZ 8 24
Hahn, Stanislav Brno, CZ 8 31
Tomanec, Filip Brno, CZ 7 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 19, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 19, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00