Coating compositions for coil coating, methods for making such coating compositions and coil coating methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10752786
APP PUB NO 20180022935A1
SERIAL NO

15658303

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Coating compositions for coil coating, methods for making such coating compositions and coil coating methods are provided. In an exemplary embodiment, a coating composition includes an organic solvent carrier and a film-forming binder dispersed in the organic solvent carrier. The film-forming binder contains an epoxy-amine adduct and a blocked or unblocked polyisocyanate crosslinking agent. The film-forming binder has associated amine groups until subjected to a temperature of at least about 165.5° C. (330° F.). The coating composition also contains a pigment and a grinding resin. The coating composition has a solids content of at least about 50 wt. % based on a total weight of the coating composition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AXALTA COATING SYSTEMS IP CO LLCTHE CORPORATION TRUST COMPANY CORPORATION TRUST CENTER 1209 ORANGE STREET WILMINGTON DE 19801

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Calhoun, Eric Romeo, US 9 9
Uhlianuk, Peter W Romeo, US 15 81

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00