Recovering bromine from solid waste containing bromine compounds, and applications thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10654720
APP PUB NO 20180022606A1
SERIAL NO

15551700

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Recovering bromine from solid waste containing bromine compounds, and applications thereof, such as for recovering bromine in a form suitable for reuse, or for manufacturing bromine salt (for example, calcium bromide). Bromine recovery method and system include: providing and mixing (i) solid waste containing bromine compounds and (ii) solid calcium hydroxide; heating the mixture in a chemical reducing (non-oxidizing) environment, thereby forming heated product consisting essentially of only solid calcium bromide (salt); and processing the heated product, to form bromine. Calcium bromide manufacturing method and system include: providing and mixing (i) solid waste containing bromine compounds and (ii) solid calcium hydroxide; heating the mixture in a chemical reducing (non-oxidizing) environment, thereby forming solid calcium bromide (salt). Applicable to processes of, or involving, manufacturing bromine-based flame (fire) retardant materials.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELCON RECYCLING CENTER (2003) LTD8551600 NEOT HOVEV

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ben, Menashe Abraham Nahariya, IL 2 0
Elgat, Zvi Maccabim-Reut, IL 8 47

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 19, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 19, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00