Vehicle speed management apparatus and vehicle speed management method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10377354
APP PUB NO 20180022327A1
SERIAL NO

15549456

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle speed management apparatus acquires scene information about a driving scene of a host vehicle, estimates the driving scene based on the scene information acquired, acquires behavior information about a driving behavior of a user, determines a driving risk of the host vehicle driven by the user, based on the driving scene estimated and on the behavior information acquired, and controls a presentation of assist information by an information presentation unit in order to prompt the user to address the driving risk. When the driving scene estimated represents an independent traveling state of the host vehicle, the assist information to be presented by the information presentation unit is selected based on a magnitude of the driving risk determined before an operation by an emergency control unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-CITY AICHI-PREF 448-8661

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kitagawa, Nozomi Kariya, JP 32 712
Yamamoto, Norio Kariya, JP 70 658

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00