Non-aqueous electrolyte secondary battery positive electrode and non-aqueous electrolyte secondary battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10340525
APP PUB NO 20180019473A1
SERIAL NO

15541868

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A non-aqueous electrolyte secondary battery positive electrode capable of suppressing a decomposition reaction of an electrolyte solution in an overcharged state is provided. A non-aqueous electrolyte secondary battery positive electrode according to this embodiment includes a positive electrode active material layer which includes a positive electrode active material (54) containing a lithium transition metal oxide, a tungsten compound (56), a phosphoric acid compound (58) not in contact with the positive electrode active material (54), and an electrically conductive agent (52) in contact with the tungsten compound (56) and the phosphoric acid compound (58).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC ENERGY CO LTD1-1 MATSUSHITA-CHO MORIGUCHI-SHI OSAKA 570-8511

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukui, Atsushi Hyogo, JP 273 2424
Isono, Takahiro Hyogo, JP 27 251
Niina, Fumiharu Hyogo, JP 48 128
Takanashi, Yuu Hyogo, JP 11 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 2, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00