Compound semiconductor device and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10276703
APP PUB NO 20180019333A1
SERIAL NO

15619679

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A compound semiconductor device includes: a carrier transit layer; a carrier supply layer over the carrier transit layer; a source electrode and a drain electrode above the carrier supply layer; a gate electrode above the carrier supply layer between the source electrode and the drain electrode; and a first insulating film and a second insulating film above the carrier supply layer between the gate electrode and the drain electrode. The gate electrode includes a portion above the second insulating film, the second insulating film covers a side surface of the first insulating film from the drain electrode side, and a second concentration of electron traps in the second insulating film is higher than a first concentration of electron traps in the first insulating film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJITSU LIMITED1-1 KAMIKODANAKA 4-CHOME NAKAHARA-KU KAWASAKI-SHI KANAGAWA 211-8588

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kamada, Youichi Yamato, JP 11 60
Ozaki, Shirou Yamato, JP 83 1110

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 30, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 30, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00