Compound semiconductor device and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10192964
APP PUB NO 20180019311A1
SERIAL NO

15617133

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A compound semiconductor device includes: a carrier transit layer; a carrier supply layer over the carrier transit layer; a source electrode and a drain electrode above the carrier supply layer; a gate electrode above the carrier supply layer between the source electrode and the drain electrode; and a first insulating film, a second insulating film, and a third insulating film above the carrier supply layer between the gate electrode and the drain electrode. The gate electrode includes a portion above the third insulating film, a first concentration of electron traps in the first insulating film is higher than a second concentration of electron traps in the second insulating film, and a third concentration of electron traps in the third insulating film is higher than the second concentration of the electron traps in the second insulating film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJITSU LIMITED1-1 KAMIKODANAKA 4-CHOME NAKAHARA-KU KAWASAKI-SHI KANAGAWA 211-8588

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kamada, Youichi Yamato, JP 11 60
Ozaki, Shirou Yamato, JP 83 1110

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 29, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 29, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00