Semiconductor device containing oxygen-related thermal donors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10192955
APP PUB NO 20180019306A1
SERIAL NO

15718189

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a semiconductor device includes determining information that indicates an extrinsic dopant concentration and an intrinsic oxygen concentration in a semiconductor wafer. On the basis of information about the extrinsic dopant concentration and the intrinsic oxygen concentration as well as information about a generation rate or a dissociation rate of oxygen-related thermal donors in the semiconductor wafer, a process temperature gradient is determined for generating or dissociating oxygen-related thermal donors to compensate for a difference between a target dopant concentration and the extrinsic dopant concentration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INFINEON TECHNOLOGIES AGCAMPBELL 1-15 NAUBIBERG GERMANY NEUBIBERG BAVARIA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jelinek, Moriz Villach, AT 35 166
Laven, Johannes Georg Taufkirchen, DE 124 734
Schulze, Hans-Joachim Taufkirchen, DE 693 4306
Schustereder, Werner Villach, AT 66 284
Stadtmueller, Michael Villach, AT 19 60

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 29, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 29, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00