Display substrate and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10355024
APP PUB NO 20180019264A1
SERIAL NO

15601984

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A display substrate includes a base substrate with a display area and a light-blocking area around the display area, a switching element disposed on the base substrate that includes a gate electrode electrically connected to a gate line extending in a first direction, a source electrode electrically connected to a data line extending in a second direction crossing the first direction, and a drain electrode spaced apart from the source electrode, a color filter layer disposed on the switching element, a first electrode disposed on the color filter layer, an insulation layer disposed on the first electrode, a second electrode disposed on the insulation layer that includes a slit, a dummy pattern disposed on substantially the same layer as the second electrode that overlaps the data line, and a data light-blocking pattern directly disposed on the dummy pattern that has substantially the same width as the data line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG DISPLAY CO LTD1 SAMSUNG-RO GIHEUNG-GU YONGIN-SI GYEONGGI-DO 17113

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Hyangyul Hwaseong-si, KR 27 70
Yang, Dong-Ju Seoul, KR 33 4277

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 16, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 16, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00