Multi-level air gap formation in dual-damascene structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10204827
APP PUB NO 20180019202A1
SERIAL NO

15690822

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An upper layer is formed in a first interlayer dielectric (ILD) layer. The upper layer comprises a plurality of metal interconnects and one or more upper layer air gaps positioned between adjacent metal interconnects. A lower layer is formed in the first ILD layer. The lower layer comprises one or more vias, and one or more lower air gaps positioned between adjacent vias. The upper layer and the lower layer are formed in accordance with a dual-damascene process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Conti, Richard A Katonah, US 73 2747
Dechene, Jessica Albany, US 20 97
Fan, Susan S Cohoes, US 8 62
Nguyen, Son V Schenectady, US 171 8962
Shearer, Jeffrey C Albany, US 27 204

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 12, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 12, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00