Metal-metal direct bonding method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10483111
APP PUB NO 20180019124A1
SERIAL NO

15650175

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for assembling a first substrate and a second substrate by metal-metal direct bonding, includes providing a first layer of a metal at the surface of the first substrate and a second layer of the metal at the surface of the second substrate, the first and second metal layers having a tensile stress (σi) between 30% and 100% of the tensile yield strength (σe) of the metal; assembling the first and second substrates at a bonding interface by directly contacting the first and second tensile stressed metal layers; and subjecting the assembly of the first and second substrates to a stabilization annealing at a temperature lower than or equal to a temperature threshold beyond which the first and second tensile stressed metal layers are plastically compressively deformed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVESFRANCE PARIS PARIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gondcharton, Paul Germigny L'exempt, FR 10 32
Imbert, Bruno Grenoble, FR 16 52
Moriceau, Hubert Saint-Egreve, FR 93 2315

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 19, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00