Reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10249428
APP PUB NO 20180019056A1
SERIAL NO

15548633

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A reactor is provided. The reactor includes a coil and a terminal block that is fixed to conductor wires that led out from both ends in a winding core direction of the coil. The terminal block includes an input-side terminal block that is fixed to an input-side conductor wire that leads out from one end of the coil, and an output-side terminal block that is fixed to an output-side conductor wire that leads out from another end portion of the coil. The input-side terminal block and the output-side terminal block are disposed on different levels in the winding core direction based on lead-out positions in the winding core direction of the input-side conductor wire and the output-side conductor wire.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAIKIN INDUSTRIES LTDOSAKA CITY OSAKA OF JAPAN OSAKA-SHI OSAKA
TAMURA CORPORATION1-19-43 HIGASHI-OIZUMI NERIMA-KU TOKYO 1788511

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ikeda, Motonobu Osaka, JP 16 107
Imai, Hiroki Saitama, JP 15 128
Shimaya, Yoshitaka Saitama, JP 1 1
Tanaka, Hideaki Osaka, JP 476 5500
Taoka, Kentarou Osaka, JP 5 104
Toyama, Iwao Saitama, JP 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00