Moveable isolated rod couplings for use in a nuclear reactor control rod drive

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10872703
APP PUB NO 20180019027A1
SERIAL NO

15644908

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Control rod drives include linearly-moveable control elements inside an isolation barrier. Control rod drives move the control element through secured magnetic elements subject to magnetic fields. Induction coils may generate magnetic fields and be moveable across a full stroke length of the control element in the reactor. A motor may spin a linear screw to move the induction coils on a vertical travel nut. A control rod assembly may house the magnetic elements and directly, removably join to the control element. The control rod assembly may lock with magnetic overtravel latches inside the isolation barrier to maintain an overtravel position. Overtravel release coils outside the isolation barrier may release the latches to leave the overtravel position. Operation includes moving the induction coils with a linear screw to drive the control element to desired insertion points, including full insertion by gravity following de-energization. No direct connection may penetrate the isolation barrier.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE-HITACHI NUCLEAR ENERGY AMERICAS LLC3901 CASTLE HAYNE ROAD WILMINGTON NC 28401

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brown, Randy M Wilmington, US 11 55
Deaver, Gerald A Wilmington, US 26 217
Major, David L Wilmington, US 11 8
Morgan, Kenneth A Wilmington, US 11 34

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00