Stage and display device using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10276103
APP PUB NO 20180018921A1
SERIAL NO

15647703

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A stage includes an output, first and second controllers, and first and second inputs. The output supplies a scan signal to a first output terminal and a carry signal to a second output terminal based on first and second node voltages and a first clock signal supplied to a first input terminal. The first controller controls a third node voltage based on a voltage of the second output terminal. The second controller controls the second node voltage based on the first clock signal supplied to the first input terminal and the third node voltage. The first input controls the first and third node voltages based on a carry signal of a previous stage supplied to a second input terminal. The second input controls the first and third node voltages based on the second node voltage and a carry signal of a next stage supplied to a third input terminal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG DISPLAY CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jun, Byung Geun Yongin-si, KR 7 44
Kim, Sung Hwan Yongin-si, KR 168 718
Park, Jun Hyun Yongin-si, KR 143 617

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 30, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 30, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00