Control device, control system, control method and program

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10311666
APP PUB NO 20180018850A1
SERIAL NO

15548809

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A prediction value calculator calculates a prediction value of an electricity fee based on the amount of electric power supplied from a commercial electric power source to electric equipment within an electricity fee calculation period. A selector selects, as a first-stage control, either one control of an electric power saving control for the electric equipment and a charge-discharge control in which the electric power supplied from the commercial electric power source is stored in a storage battery in a first time slot and the electric power stored in the storage battery is supplied to the electric equipment in a second time slot in which the unit cost of the electric power supplied from the commercial electric power source is greater than that in the first time slot. A controller executes the first-stage control selected by the selector when the prediction value calculated by the prediction value calculator is greater than a targeted value of the electricity fee.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 100-8310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Maruyama, Ichiro Tokyo, JP 41 324
Minezawa, Satoshi Tokyo, JP 42 235
Sato, Kaori Tokyo, JP 31 173
Yabe, Masaaki Tokyo, JP 45 498
Yano, Hirotoshi Tokyo, JP 38 271

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00