System and method for generating enhanced stereographic videos of aircraft build processes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10445867
APP PUB NO 20180018764A1
SERIAL NO

15209733

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a system and method for generating enhanced stereographic videos of aircraft build processes. Specifically, the system comprises a stereoscopic recording device configured to capture a plurality of stages of an aircraft build process. The system further comprises one or more processors, memory, and one or more programs stored in the memory that comprise instructions for execution by the system to build a stereographic library including repositories of 3D video corresponding to the plurality of stages of the aircraft build process. The system then generates an enhanced walkthrough video of the aircraft build process. The enhanced walkthrough video may include a parallax grid overlay and/or a thermal scan overlay integrated into the video. The system may then analyze the enhanced walkthrough video using post-processing analytics to identify anomalies and irregularities that occurred during the aircraft build process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY929 LONG BRIDGE DRIVE ARLINGTON VA 22202

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Chong Media, US 6 44
Glatfelter, John W West Chester, US 30 329

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00