Locking a group of images to a desired level of zoom and an object of interest between image transitions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10049431
APP PUB NO 20180018754A1
SERIAL NO

15398389

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an embodiment, a user equipment (UE) groups a plurality of images. The UE displays a first image among the plurality of images, determines an object of interest within the first image and a desired level of zoom, and determines to lock onto the object of interest in association with one or more transitions between the plurality of images. The UE determines to transition to a second image among the plurality of images, and detects, based on the lock determination, the object of interest within the second image. The UE displays the second image by zooming-in upon the object of interest at a level of zoom that corresponds to the desired level of zoom.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QUALCOMM INCORPORATED5775 MOREHOUSE DRIVE SAN DIEGO CA 92121-1714

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arellano, Suzana San Diego, US 17 350
Keating, Virginia Walker San Diego, US 51 4652
Leng, Bing San Diego, US 12 26
Rivas, Daniel San Diego, US 3 15
Wu, Bing-Hsun Ann Arbor, US 1 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00