Delay-tolerant information-centric networking (DTICN)

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10997636
APP PUB NO 20180018713A1
SERIAL NO

15648272

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and system provide the ability to distribute content on a network. A network system of nodes is established. Each node hosts a repository daemon (RD). A data source node receives a bundle that includes a payload and a digest extension that includes metadata that characterizes an application data unit (ADU) encapsulated by the payload. A local RD of the data source node caches the received bundle and publishes an advertisement (that includes the digest extension block) for the received bundle. The local RD, of a data requesting node subscribes to advertisements, receives an expression of interest (EOI), searches the published advertisements for a matching advertisement that matches the EOI, and obtains the bundle corresponding to the matching advertisement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CALIFORNIA INSTITUTE OF TECHNOLOGY1200 E CALIFORNIA BLVD M/C 6-32 PASADENA CA 91125

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Burleigh, Scott C Pasadena, US 1 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 4, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 4, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 4, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00