Pressure-sensitive touch panel, method for manufacturing the same, and touch display screen

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10318039
APP PUB NO 20180018056A1
SERIAL NO

15649965

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pressure-sensitive touch panel, a method for manufacturing the pressure-sensitive touch panel, and a touch display screen are provided. The pressure-sensitive touch panel includes a substrate and a touch sensor and a pressure sensor arranged on the substrate. The touch sensor includes a first electrode and a second electrode, and the pressure sensor includes an upper electrode, a lower electrode and a dielectric layer arranged between the upper electrode and the lower electrode. The upper electrode and the first electrode are arranged in the same layer and formed of the same material, the lower electrode and the second electrode are arranged in the same layer and formed of the same material, and the dielectric layer is formed of an elastic insulation material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOE TECHNOLOGY GROUP CO LTDNO 10 JIUXIANQIAO RD CHAOYANG DISTRICT BEIJING 100015
HEFEI XINSHENG OPTOELECTRONICS TECHNOLOGY CO LTDXINZHAN INDUSTRIAL PARK HEFEI ANHUI 230012

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Youlu Beijing, CN 4 5
Wang, Qingpu Beijing, CN 49 123
Xu, Jiawei Beijing, CN 62 203

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 11, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 11, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00