Input/output panel, input/output device, and semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10152160
APP PUB NO 20180018054A1
SERIAL NO

15645019

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An input/output device includes a first sensor electrode and a second sensor electrode. In addition, the input/output device includes a first electrode and a second electrode which are electrodes for a display element, and a substrate sandwiched between the first sensor electrode and the second sensor electrode. The second sensor electrode is formed concurrently with the first electrode using the same material. The input/output device sensors a change in capacitance of a capacitor formed between the first sensor electrode and the second sensor electrode. Furthermore, a third sensor electrode to which a floating potential is applied may be provided to overlap with the first electrode. In the input/output device, either a liquid crystal element or a light-emitting element may be used, or both the liquid crystal element and the light-emitting element may be used.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEMICONDUCTOR ENERGY LABORATORY CO LTDKANAGAWA KANAGAWA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kimura, Hajime Kanagawa, JP 1121 33576
Yamazaki, Shunpei Tokyo, JP 7526 239327

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 11, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 11, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00