Dome cover, camera device, injection molding die, and injection molding method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10401715
APP PUB NO 20180017851A1
SERIAL NO

15714467

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides a dome cover, a camera device, an injection molding die, and an injection molding method in which generation of a weldline is suppressed and deterioration of an acquired image is suppressed. In one aspect of the invention, a dome cover is a dome cover that covers a camera. The dome cover includes a curved section having a curved shape and a skirt section having a cylinder shape and has a top section at the curved section and an opening end section at the skirt section. The thickness of the dome cover is largest at the top section and smallest at the opening end section, and continuously decreases from the top section toward the opening end section. The inner diameter and the outer diameter of the dome cover continuously increase from the top section toward the opening end section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJIFILM CORPORATION26-30 NISHIAZABU 2-CHOME MINATO-KU TOKYO 106-8620

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Watanabe, Seiichi Saitama, JP 175 2764

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00