Optical projection device and projector that corrects the inclination of the movable lens frame with respect to the optical axis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10180560
APP PUB NO 20180017758A1
SERIAL NO

15543186

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A optical projection device that projects an image with excellent image quality while achieving miniaturization is provided. The optical projection device includes a first lens frame holding a first lens group L1 and including a cam pin, a guide barrel including a straight movement groove, a cam barrel including a cam groove, and an urging portion that urges the first lens frame in a direction intersecting with the direction along an optical axis. The cam pin is formed at a position spaced apart from a center of gravity including the first lens frame and members attached to the first lens frame in the direction along the optical axis Ax and the urging portion urges the first lens frame at a position closer than the cam pin with respect to the center of gravity in the direction along the optical axis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEIKO EPSON CORPORATION4-1 NISHI-SHINJUKU 2-CHOME SHINJUKU-KU TOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hatano, Takuya Matsumoto, JP 9 25
Takehana, Naoto Matsumoto, JP 20 60

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 15, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 15, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00