Exhaust emission control system of engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10443521
APP PUB NO 20180017002A1
SERIAL NO

15638719

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An exhaust emission control system of an engine is provided, which includes a NOx catalyst disposed in an exhaust passage for storing NOx within exhaust gas when an air-fuel ratio of the exhaust gas is lean, and reducing the stored NOx when the air-fuel ratio is approximately stoichiometric or rich. A processor executes a NOx reduction controlling module for performing a NOx reduction control in which a fuel injector performs a post injection to control the air-fuel ratio to a target ratio, and an EGR controlling module for controlling an EGR valve to recirculate EGR gas. In the NOx reduction control, the EGR controlling module controls an opening of the EGR valve to a target opening smaller than when the NOx reduction control is not performed. The NOx reduction controlling module starts the control after the EGR valve opening is controlled to the target opening.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAZDA MOTOR CORPORATIONJAPAN'S HIROSHIMA COUNTY GOVERNMENT IN THE NEW TOWN YUNJUN ANN 3 NO 1

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kanno, Masonobu Hiroshima, JP 1 0
Nishimura, Hiroyuki Higashihiroshima, JP 144 1531
Tanimura, Kenji Hiroshima, JP 17 82

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00