Systems and methods for controlling load rate of change using a variable multiplier

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10352251
APP PUB NO 20180016990A1
SERIAL NO

15414475

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method includes determining a commanded load rate of change of an industrial system, wherein the commanded load rate of change comprises a rate of load placed on an industrial machine of the industrial system. The method also includes determining a measured load rate of change of the industrial system based at least in part on an output power of the industrial system. The method further includes determining a variable multiplier based at least in part on the commanded load rate of change and the measured load rate of change. The method also includes applying the variable multiplier to a load rate command to the industrial system to generate a multiplied load rate command. The method further includes sending a signal to the industrial system to control the rate of the load placed on the industrial machine based at least in part on the multiplied load rate command.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON RD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Laskowski, Benjamin David Greenville, US 8 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 16, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 16, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00