Tire

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10821781
APP PUB NO 20180015789A1
SERIAL NO

15631055

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tire includes a tread part having main grooves and lands demarcated by the main grooves. A crown land between a pair of crown main grooves includes first crown lug grooves extending from one crown groove to tire axial direction inner side and terminated within the crown land, second crown lug grooves extending from the other crown groove to the tire axial inner side and terminated within the crown land, and first crown sipes formed at tire circumferential direction positions and connecting the crown grooves, each first crown sipe includes a first side crown sipe piece extending from one crown groove to the tire axial inner side, a second side crown sipe piece not positioned on an extension line of the first side piece and extending from the other crown groove to the tire axial inner side, and a connecting crown sipe piece connecting the first and second sipe pieces.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO RUBBER INDUSTRIES LTDKOBE CITY JAPAN HYOGO CENTRAL CRISP BANG TOWN 3 CHOME 6 NO 9 KOBE-SHI HYOGO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Horiguchi, Toshiki Kobe, JP 10 44
Kanematsu, Yoshiaki Kobe, JP 18 64
Yamaoka, Hiroshi Kobe, JP 45 240

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 3, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 3, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00