Joining member, solder material, solder paste, formed solder, flux coated material, and solder joint

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10675719
APP PUB NO 20180015572A1
SERIAL NO

15539323

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided herein is a solder material that includes a spherical core that provides space between a joint object and another object to be joined to the joint object and a solder coated layer that has a melting point at which a core layer of the core is not melted. The solder coated layer includes Sn as a main ingredient and 0 to 2 mass % of Ag, and coats the core. The solder coated layer has an average grain diameter of crystal grains of 3 μm or less, and the solder material has a spherical diameter of 1 to 230 μm and a sphericity of 0.95 or more.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SENJU METAL INDUSTRY CO LTD23 SENJU-HASHIDO-CHO ADACHI-KU TOKYO 120-8555

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hagiwara, Takashi Tochigi, JP 62 2330
Ikeda, Atsushi Tochigi, JP 204 2892
Kawamata, Yuji Tochigi, JP 43 196
Kawasaki, Hiroyoshi Tokyo, JP 65 151
Kondo, Shigeki Tochigi, JP 53 1581
Roppongi, Takahiro Tochigi, JP 28 160
Sato, Isamu Saitama, JP 96 1235
Soma, Daisuke Tochigi, JP 28 149
Tsuruta, Kaichi Tochigi, JP 25 199

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 9, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 9, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00