Method of making injectable cements

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10632227
APP PUB NO 20180015198A1
SERIAL NO

15548389

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A discovery of the conversion of amorphous calcium polyphosphate (ACPP) or/and other polyphosphate salts with various type of calcium phosphate to new calcium phosphate product (i.e. dicalcium phosphate dihydrate (DCPD)) in a liquid environment. The discovery includes mixing a various type of calcium phosphate with an aqueous ACPP or/and other polyphosphate salts gel, which is fast setting and possessing strong mechanical strength, and can be gradually converted to DCPD/hydroxyapatites in physiological condition. This injectable past can be applied as alternative of conventional CPC bone cement that is suitable for bone void repair due to its excellent properties in osteoconductivity and osseointegration. It can also be applied as drug delivery device in tissue engineering for its strong bonding to drug molecules.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WAYNE STATE UNIVERSITY656 W KIRBY 4032 F/AB DETROIT MI 48202

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ren, Weiping Westland, US 5 3
Song, Wei Warren, US 301 954

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00