Transfer switch source select systems and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10756565
APP PUB NO 20180013317A1
SERIAL NO

15205451

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to aspects of the disclosure, a method and system are provided for transferring a load between a primary power source and a secondary power source. In accordance with the disclosure, a method of transferring a load between a first power source and a second power source includes analyzing a plurality of power sources to identify one or more power sources providing a power greater than a threshold value. The method also includes selecting a power source from the identified one or more power sources providing power greater than the threshold value. The method further includes connecting the selected power source to a transfer mechanism. The method still further includes actuating the transfer mechanism, using power provided to the transfer mechanism by the selected power source, to transfer the load from a connection with the first power source to a connection with the second power source.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ASCO POWER TECHNOLOGIES L P50 HANOVER ROAD FLORHAM PARK NJ 07932

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hayes, John E Hardwick, US 43 399

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00