MODEL-BASED CONTROL SYSTEM AND METHOD FOR TUNING POWER PRODUCTION EMISSIONS
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
N/A
app pub date -
Jul 11, 2016
filing date -
Jul 11, 2016
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A model-based control system is configured to select a desired parameter of a machinery configured to produce power and to output emissions and to select an emissions model configured to use the desired parameter as input and to output an emissions parameter. The model-based control system is additionally configured to tune the emissions model via a tuning system to derive a polynomial setpoint, and to control one or more actuators coupled to the machinery based on the polynomial setpoint.
First Claim
all claims..Other Claims data not available
Family
- No Family data available.
- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
GENERAL ELECTRIC COMPANY | 1 RIVER ROAD SCHENECTADY NY 12345 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Block, Frederick William | Greenville, US | 19 | 345 |
# of filed Patents : 19 Total Citations : 345 | |||
Whitright, Brian James | Greenville, US | 4 | 81 |
# of filed Patents : 4 Total Citations : 81 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 4 Citation Count
- H02J Class
- 22.71 % this patent is cited more than
- 7 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jul 11, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jul 11, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
