Heterogeneous nanostructures for hierarchal assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10243143
APP PUB NO 20180013070A1
SERIAL NO

15699527

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of making a carbon nanotube structure includes depositing a first oxide layer on a substrate and a second oxide layer on the first oxide layer; etching a trench through the second oxide layer; removing end portions of the first oxide layer and portions of the substrate beneath the end portions to form cavities in the substrate; depositing a metal in the cavities to form first body metal pads; disposing a carbon nanotube on the first body metal pads and the first oxide layer such that ends of the carbon nanotube contact each of the first body metal layers; depositing a metal to form second body metal pads on the first body metal pads at the ends of the carbon nanotube; and etching to release the carbon nanotube, first body metal pads, and second body metal pads from the substrate, first oxide layer, and second oxide layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IBM CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Frank, Martin M Dobbs Ferry, US 125 1621
Han, Shu-Jen Cortlandt Manor, US 225 1578
Tulevski, George S Croton-on-Hudson, US 94 790

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 26, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 26, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00