Display substrate and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10211227
APP PUB NO 20180012909A1
SERIAL NO

15632156

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A display substrate includes: a base substrate; a switching device disposed on the base substrate, the switching device including a gate electrode, a source electrode, and a drain electrode overlapping at least a part of the gate electrode; a wavelength converting layer disposed on the switching device, the wavelength converting layer including a quantum dot; a bridge electrode disposed on the wavelength converting layer, the bridge electrode electrically connected to the drain electrode through a first contact hole formed through the wavelength converting layer; a planarizing layer disposed on the wavelength converting layer; and a pixel electrode disposed on the planarizing layer, the pixel electrode electrically connected to the bridge electrode through a second contact hole formed through the planarizing layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG DISPLAY CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
An, Moonjung Hwaseong-si, KR 6 33
Cho, Hyungbin Seongnam-si, KR 15 32
Jo, Gugrae Asan-si, KR 23 117
Kim, Eunjung Suwon-si, KR 58 524
Kim, Taewoo Seoul, KR 139 933

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 19, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 19, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00