Semiconductor package and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9966360
SERIAL NO

15202541

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor package and a manufacturing method for the semiconductor package are provided. The semiconductor package has a first redistribution layer, a first die over the first redistribution layer, a molding compound encapsulating at least one second die and at least one third die disposed on the first redistribution layer, and at least one fourth die and conductive elements connected to the first redistribution layer. Through vias of the first die are electrically connected to through interlayer vias penetrating through the molding compound and are electrically connected to the first redistribution layer. The semiconductor package may further include a second redistribution layer disposed on the molding compound and between the first die, the second die and the third die.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIWAN SEMICONDUCTOR MANUFACTURING CO LTD8 LI-HSIN RD 6 HSINCHU SCIENCE PARK HSINCHU 300-78

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yee, Kuo-Chung Taoyuan, TW 221 2787
Yu, Chen-Hua Hsinchu, TW 2207 47923
Yu, Chun-Hui Hsinchu County, TW 51 599

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00