Semiconductor device package and methods of manufacture thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10825747
APP PUB NO 20180012815A1
SERIAL NO

15710098

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a packaged semiconductor device includes forming an assembly by placing a semiconductor die over a substrate with a die attach material between the semiconductor die and the substrate. A conformal structure which includes a pressure transmissive material contacts at least a portion of a top surface of the semiconductor die. A pressure is applied to the conformal structure and in turn, the pressure is transmitted to the top surface of the semiconductor die by the pressure transmissive material. While the pressure is applied, concurrently encapsulating the assembly with a molding compound and exposing the assembly to a temperature that is sufficient to cause the die attach material to sinter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NXP USA INC6501 WILLIAM CANNON DRIVE WEST AUSTIN TX 78735

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Li Scottsdale, US 1435 18853
Molla, Jaynal A Gilbert, US 48 933
Viswanathan, Lakshminarayan Phoenix, US 95 679

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 3, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 3, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00