Gas supply system, substrate processing system and gas supply method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10665430
APP PUB NO 20180012735A1
SERIAL NO

15645521

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gas supply system includes: a first flow channel connecting a first gas source and a chamber; a second flow channel connecting a second gas source and the first flow channel; a control valve, provided in the second flow channel, configured to control a flow rate of the second gas; an orifice provided downstream of the control valve and at a terminus of the second flow channel; a switching valve, provided at a connection point between the first flow channel and the terminus of the second flow channel, configured to control a supply timing of the second gas; an exhaust mechanism, connected to a flow channel between the control valve and the orifice in the second flow channel, configured to exhaust the second gas; and a controller configured to bring the control valve, the switching valve and the exhaust mechanism into operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOKYO ELECTRON LIMITEDTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amikura, Norihiko Miyagi, JP 67 931
Kishida, Yoshiharu Miyagi, JP 2 12
Nishino, Kouji Osaka, JP 169 2577
Sawachi, Atsushi Miyagi, JP 33 453
Sawada, Yohei Osaka, JP 35 277

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00