Gas circuit breaker

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10115548
APP PUB NO 20180012716A1
SERIAL NO

15538117

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gas circuit breaker includes a rod-shaped fixed arc contact, a cylindrical movable arc contact to contact or be separated from the fixed arc contact, a heat puffer chamber storing an arc-extinguishing gas to be blown to an arc generated between the fixed arc contact and the movable arc contact, and an insulator received within a receiving hole formed in a distal end part of the fixed arc contact. An end surface of the insulator on a side of the movable arc contact faces the side of the movable arc contact via an opening end of the housing hole, the end surface on the side of the movable arc contact is disposed closer to the inside of the housing hole than the opening end is, and the insulator is made of an ablation material that is vaporized by heat of the arc.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 100-8310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakamura, Yasunori Tokyo, JP 75 404
Yoshida, Daisuke Tokyo, JP 232 1714
Yoshitomo, Yuji Tokyo, JP 19 43

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00