Determining visibility of rendered content

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10068352
APP PUB NO 20180012378A1
SERIAL NO

15279103

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods, systems, and apparatus, including computer programs encoded on a computer storage medium, for determining whether content rendered on a display is actually visible to a user. In one aspect, a method includes generating and transmitting content presentation data that causes a user device to present, at a display and over a first time period, a content item that includes one or more content portions that are each designated for presentation in a respective first color. For a second time period, the respective first color of a particular content portion is changed to a second color. Visual representation data that includes a visual representation of the display during the second time period is generated and provided. Using the visual representation, an amount of the content item that was visible at the display is determined based on an amount of the particular content portion presented in the second color.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GOOGLE LLC1600 AMPHITHEATRE PARKWAY MOUNTAIN VIEW CA 94043

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Khandpur, Sundeep Singh Sunnyvale, US 3 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00