Optimized hydromodification management with active stormwater controls

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10831164
APP PUB NO 20180011452A1
SERIAL NO

15713147

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system, methodology, and programming logic for active stormwater controls to optimize sizing and design of Hydromodification Management (HM) structural Best Management Practices (BMPs) to achieve optimal flow duration control. Control logic enables the controlled release of stormwater from a BMP in a manner most akin to pre-development flow duration curves. Inputs to this logic include: flow duration curves based on continuous hydrologic simulation for pre- and post-development conditions; real-time measurement of water level within the BMP; and real-time measurement of discharge entering the BMP. This control logic can interact with control logic for other stormwater management objectives, such as harvest and reuse, infiltration, and combined sewer overflow prevention, and respective inputs, such as real-time weather forecast data, precipitation gage data, downstream flow gauge data, and water quality data, to meet those design objectives as well. New HM BMPs can be optimized to be smaller and, thus, more feasible to implement. Existing stormwater facilities designed for flood control or other management objectives can be retrofitted to provide hydromodification control as well. When utilized with real-time flow and water level monitoring equipment and data, the flow release logic can be adaptively adjusted without physical retrofit of the BMP's outlet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OPTIRTC HOLDINGS LLC1330 BEACON STREET SUITE 317 BROOKLINE MA 02446

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goodman, Judd El Cerrito, US 2 12
Quigley, Marcus Brookline, US 6 48

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 10, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 10, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00