Power controller and power control method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10180620
APP PUB NO 20180011387A1
SERIAL NO

15544378

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present technology relates to a power controller, a power control method, and a program which appropriately supply power to an actuator for driving a shutter and an actuator for camera shake correction. A power controller includes a shutter controller for controlling a shutter driving unit, a camera shake correction controller for controlling a camera shake correction driving unit, and a power amount setting unit for setting amounts of power to be allocated to the shutter driving unit and the camera shake correction driving unit according to a set shutter speed. The power amount setting unit allocates the amount of power to be supplied to the camera shake correction driving unit when the shutter speed is equal to or less than a predetermined speed to the shutter driving unit in a case where the shutter speed is faster than a predetermined speed. The present technology available for an image pickup device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SONY CORPORATIONTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hara, Yuki Tokyo, JP 92 337
Murashima, Nobuharu Tokyo, JP 33 348

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 15, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 15, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00