Array substrate and manufacture method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9891488
SERIAL NO

15714852

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing an array substrate is provided. The array substrate, by providing a black matrix and a color resist layer on the array substrate and providing the color resist layer on the TFT layer, prevents bad influences on the color resist layer caused by a high temperature TFT process so as to provide a liquid crystal panel with improved displaying quality. The method includes, firstly, forming a black matrix on a substrate, and secondly, implementing a TFT manufacture process on the black matrix, and then forming a color resist layer after the TFT manufacture process. Accordingly, forming both the black matrix and the color resist layer on the array substrate can be achieved, where the color resist layer is formed after the TFT manufacture process to prevent bad phenomenon caused by the high temperature of the TFT process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHENZHEN CHINA STAR OPTOELECTRONICS TECHNOLOGY CO LTDNO 9-2 TANGMING ROAD GUANGMING DISTRICT SHENZHEN CITY GUANGDONG 518132

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Song, Liwang Guangdong, CN 13 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00