Manufacturing method for COA substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9904128
SERIAL NO

15023692

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure provides a manufacturing method for COA substrate: utilizing PEDOT, PProDOT or PEDOT derivatives with or without doping with graphene, or PProDOT derivatives replaces traditional ITO to be conductive materials of pixel electrodes; quantum dots can be modified by ProDOT derivatives or EDOT derivatives which including carboxyl group, and quantum dot color filters of red filter layers, green filter layer and blue filters layers comprised on the TFT substrate are formed by the method of electric chemical deposition based on a property of the aforementioned two being able to polymerize under influences of electric field and pixel electrode patterns on the TFT substrate. Therefore, zero waste can be achieved in quantum dots, a usage of quantum dots can be decreased, indium usage can be decreased, researching and development cost can be reduced, and the circumstances can be protected, furthermore, the QDs color film having the better bonding strength bonds the counter electrode layer through chemical bond, and avoids adverse results as a peel is caused by insufficient bonding strength between photoresist and substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHENZHEN CHINA STAR OPTOELECTRONICS TECHNOLOGY CO LTDNO 9-2 TANGMING RD GUANGMING NEW DISTRICT SHENZHEN GUANGDONG 518132

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deng, Weijia Shenzhen, CN 5 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00