Characterization of phase shifter circuitry in integrated circuits (ICs) using standard automated test equipment (ATE)

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10371741
APP PUB NO 20180011171A1
SERIAL NO

15207341

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for characterizing a phase shifter in a device under test (DUT) using automated test equipment (ATE) is disclosed. The method comprises down converting an input signal received from the transmitter DUT to an intermediate frequency and routing the down converted input signal to a signal processor, wherein the signal processor generates I and Q signals using the input signal. The method further comprises setting an initial phase state on the phase shifter in the transmitter DUT and toggling at least one phase state bit to control the phase shifter to cycle through a plurality of phase states, wherein the changing phase states appear on the I and Q signals. Finally, the method comprises processing the I and Q signals to extract individual phase states programmed by the at least one phase state bit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ADVANTEST CORPORATION1-6-2 MARUNOUCHI CHIYODA-KU TOKYO 100-0005

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McAleenan, Roger San Jose, US 8 49

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 6, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 6, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00