High-voltage measuring unit with self-correction

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10901004
APP PUB NO 20180011128A1
SERIAL NO

15710243

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present application relates to a method for providing a corrected measuring signal indicating a high voltage on a high-voltage node (HV), including: injecting a periodic injection signal into a voltage divider coupled between the high-voltage node (HV) and a reference potential; obtaining a sensing signal at a sensing node (S) of the voltage divider, wherein the sensing signal depends on the periodic injection signal; from the sensing signal, separating a first sensing signal portion resulting from the high voltage and a second sensing signal portion resulting from the periodic injection signal; and depending on the second sensing signal portion, correcting the first sensing signal portion corresponding to the high-voltage signal in order to obtain the corrected measuring signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABB SCHWEIZ AGBRUGGERSTRASSE 66 BADEN CH-5400

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bloch, Richard Nussbaumen, CH 8 244
Pascal, Joris Basel, CH 8 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 26, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 26, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00