Nacelle anti ice system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10450955
APP PUB NO 20180010519A1
SERIAL NO

15202758

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An anti-icing system of a nacelle inlet of an engine of an aircraft includes first and second direct acting valves and first and second control valve assemblies fluidly connected to the nacelle inlet. The first direct acting valve includes a first inlet, outlet, valve chamber, and piston. The first piston is positioned in the first direct acting valve. The first control valve assembly is fluidly connected to the first valve. The second direct acting valve includes a second inlet, outlet, valve chamber, and piston. The second piston is positioned in the second direct acting valve. The second direct acting valve is fluidly connected to the first direct acting valve in a series configuration. The second control valve assembly is fluidly connected to the second valve chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RTX CORPORATION10 FARM SPRINGS ROAD FARMINGTON CT 06032

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goodman, Robert West Hartford, US 26 197
Greenberg, Michael D Bloomfield, US 50 299
Zheng, Zhijun Avon, US 19 130

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00