Clamper and holding jig including same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10669643
APP PUB NO 20180010261A1
SERIAL NO

15712744

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A clamper includes: a first clamping member having a first base portion and a first contact portion that is to be in contact with one surface of the workpiece; a second clamping member having a second contact portion that is to be in contact with the other surface of the workpiece; and a clamping member biasing member configured to bias at least one of the first clamping member and the second clamping member in a direction of bringing the first contact portion and the second contact portion closer to each other. The first contact portion has a plurality of plate spring portions extending from the first base portion, the plurality of plate spring portions configured to elastically deform independently from each other to come into contact with the workpiece.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
C UYEMURA & CO LTD2-6 DOSHO-MACHI 3-CHOME CHUO-KU OSAKA-SHI OSAKA 541-0045

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kohama, Kouhei Osaka, JP 5 11
Miyoshi, Kazuya Osaka, JP 3 14
Teoh, Kahyeong Osaka, JP 2 7
Uemura, Tetsuro Osaka, JP 9 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 2, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00