Shock-absorbing unit, manufacturing method thereof, and member connection structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10035544
APP PUB NO 20180009481A1
SERIAL NO

15352067

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A shock-absorbing unit may include a reinforcement part made of a composite material, which has a panel shape, two opposing end portions of which are connected to the inner panel to divide the inner space into a separation space adjacent to the outer panel and a partition space adjacent to the inner panel, and which has a coupling protrusion protruding from the inner surface thereof toward the inner panel, and a shock-absorbing part made of a composite material, which has a coupling recess formed in one side thereof to receive the coupling protrusion so as to be connected to the reinforcement part in the partition space, and the opposite side of which is connected to the inner surface of the inner panel and is supported by the inner panel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYUNDAI MOTOR COMPANY12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Chang Dong Suwon-si, KR 25 158
Lee, Sang Heon Seoul, KR 245 457

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 31, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 31, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00