Braking force control system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10081362
APP PUB NO 20180009440A1
SERIAL NO

15633299

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A braking force control system includes: a brake device and at least one electronic control unit. The brake device is configured to generate a braking force commensurate with a brake operation amount of a driver. At least one electronic control unit is configured to execute vehicle speed control for controlling a speed of a vehicle to a target speed by controlling a driving force and a braking force. The electronic control unit is configured to cause the brake device to generate an actual braking force corresponding to a total value of an additional braking force and an operational braking force when brake operation is performed during execution of the vehicle speed control. The additional braking force corresponds to a controlled braking force required by the vehicle speed control. The operational braking force is required through the brake operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kozuka, Tomoyuki Sunto-gun, JP 32 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00