Branch-line coupler

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9893409
SERIAL NO

15200151

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A branch-line coupler suitable for use in mobile devices includes a first, second, third, and fourth ports, respectively acting as input, transmitted, coupled, and isolated port. A first, second, third, and fourth connection parts are connected to the ports and transmission lines. First and second bent transmission lines are electrically connected between first and second ports. Third and fourth bent transmission lines are electrically connected between third and fourth ports. A first long strip transmission line is electrically connected between the first port and the fourth port. A second long strip transmission line is electrically connected between the second port and the third port. The branch-line coupler occupies a small area and has high performance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NANNING FUGUI PRECISION INDUSTRIAL CO LTDNO 5 WORKSHOP PHASE III CHINA ASEAN ENTERPRISE HEADQUARTERS BASE NO 18 HEADQUARTERS ROAD HIGH TECH ZONE NANNING GUANGXI 530007 NANNING CITY THE GUANGXI ZHUANG AUTONOMOUS REGION 530007

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chueh, Yu-Chih New Taipei, TW 19 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00